Cannon Air Force Base Apron and Taxiway Lighting
This project included the demolition of old feeder conduit and wire, old taxiway lighting and signs, old telecommunications cables to install new taxiway lighting and telecommunications, which included: approximately 2 miles underground duct bank feeder, install 500 MCM 15 KV wire and terminations via new or existing manholes and above-ground distribution system; approximately 2 new miles of duct bank fiber optic communications conduit; fiber optic wiring and terminations for the relocation of US Air Forces strobe controller for new and existing air field lighting, plus new strobe rack with backup generator and ATS. Lighting for new taxiway, aircraft parking and active runways.
Ft Huachuca Joint Interoperability Test Command Chiller
The Joint Interoperability Test Command (JITC) is DOD’s Joint Interoperability Certifier and the only Non-Service Operational Test Agency for Information Technology (IT) National Security Systems (NSS). The JITC is a secure facility and the functionality of the chilled water plant is critical for its operations. Not only does it keep occupants comfortable, but it provides cooling for mission-critical equipment in the building. The project scope included the installation of a new 1000A service to power a temporary chiller and the installation of branch power to the various controls and disconnects for the new systems. The project was completed on time, under budget, and with no unplanned outages.
Kirtland Air Force Base
This large design-build project called for the installation of new and replacement of existing electrical usage self-reporting meters on hundreds of buildings throughout the 52,000 acres of Kirtland Air Force Base in New Mexico.
Arizona Game and Fish Headquarters
Ground-up development for the Arizona Game & Fish Department’s North Phoenix headquarters was awarded LEED Platinum after initially pursuing Silver. It was the fourth building in the entire state of Arizona to receive LEED Platinum certification. Construction included the 82,000 square foot, single story commercial office building, transportation storage area and maintenance facility, and 27,000 square foot pre-engineered metal warehouse. Wilson Electric provided electrical installation and distribution as well as site lighting throughout the 117,115 square foot complex. NETSIAN Technologies Group provided all communications infrastructure.
Arizona Air National Guard
The project includes 101,000 SF aircraft maintenance hangar and shop facilities. The area consists of two maintenance hangars for Air National Guard KC-135 tanker aircraft. The Arizona Air National Guard neighbors the busy Phoenix Sky Harbor Airport flight line. Some amenities include vehicle maintenance, vehicle fueling, engine shop, avionics shop, NDI area, and AFFF fire protection system.